AI-assisted SAP® development. The AI builds, the consultant decides.
SE80 was yesterday.
-
SE80
-
Eclipse
-
Web IDE
-
Business Application Studio
-
Second Key
This is how we develop SAP® applications with AI. Our consultant describes what your process needs. Second Key selects the right technology for the specified target release and presents the plan – the first key. The consultant turns the second with their GO: only then does the change go into the system – checked, activated and versioned in Git.
The AI builds.
The consultant decides.
Two keys. Full control.
How AI-assisted ABAP development works with Second Key
The AI brings the speed, the 24-LOG consultant the approval.
What you get
-
Incredibly fast
Our consultant describes what your process needs – plan, code, checks and activation run in one go. Days instead of weeks and months.
-
Our system – or yours
By default, Second Key works on the 24-LOG SAP® S/4HANA system; only the checked result reaches your system. On request, we develop directly on your system.
-
Delivered in our namespace
Everything under /LOG24/, cleanly separated from your own objects – in a transport that your team imports.
-
Guardrails
Rules and technical locks define what the agent may do.
-
Approval
Every change in the system only after a plan and a GO.
-
Traceability
Every change is in Git, with diff and commit.
-
SAP® GUI
Reports, dynpros with GUI status, forms with Smart Forms and Adobe Forms – everything your operations work with every day.
-
Fiori, UI5 and RAP
App and backend from a single source – classic or with RAP and ABAP Cloud, with plan and GO.
-
Your release
Code for the system you have – checked against the specified target release before every activation and after every push.
-
Documented, not a black box
Status, open items and decisions are kept traceably in the repository.
-
Requirements with evidence
For every requirement, we show whether it has been implemented – with the location in the code.
-
Independent of individuals
Project knowledge lives in the repository, not in individual heads – anyone on the team can take over.
Use cases
What you use Second Key for in your SAP® system
Wherever your process needs more than SAP® standard – from a small report to your own app. Where AI helps in your SAP® beyond development is shown on the page AI in SAP®.
-
Custom ABAP development and dynpros
Reports, dynpros with GUI status, classes, enhancements and BAdIs – planned, built and checked in days instead of weeks.
-
Fiori, UI5 and RAP apps
User interfaces for warehouse, production and shipping, classic or with ABAP Cloud, aligned with your target release.
-
Interfaces
Connections to MES, PLM, CAQ, scales and machines – optionally with central monitoring in the 24-LOG Interfacemonitor.
-
Custom code for S/4HANA
Analyse, clean up and adapt custom developments for the conversion, traceable object by object.
-
Understanding existing code
Read, document and extend grown developments in a targeted way – before anyone changes anything.
-
Forms and printing
Delivery notes, labels, consignment notes – with Smart Forms or Adobe Forms, including print program and test data.
-
Translations
Translate everything in SE63 – user interfaces, field labels, messages and the descriptions of technical objects, for rollouts and new sites. Like every change: plan first, then GO.
-
Bring custom solutions into SAP®
What has grown over decades in other systems – databases, spreadsheets, in-house tools – rebuilt directly in SAP®: as a clean extension, without forcing the process into the standard. More in the article →
Your process knowledge, implemented directly in the SAP® system
You know the process. The AI writes the code – what goes into the system is decided by a human.
-
Plan
The agent checks against the specified target release and shows what it intends to create and change – object by object.
-
GO
The second key: work continues only after approval by the 24-LOG consultant. If the plan changes, a new GO is required.
-
System
The agent creates, activates and checks in the SAP® system – with a log and a test link to the app.
-
Git
Every change is versioned in Git. Whatever still has to be done manually is on the list at the end.
The workspace
One window. Five buttons. Done.
No thousand menus, no jumping between dozens of tools. The consultant works in a single window – and sees everything that matters there.
-
Open items always in view
The project’s open items are on the left, with owner and status, and below them what is in progress and what is waiting on others. Whatever is resolved moves into the repository – nothing gets lost in a chat.
-
Watch it live
In the middle you see, step by step, what Second Key is reading, searching and building – directly in the SAP® system, not in a black box.
-
Five buttons for the day
Fetch status, today’s tasks, new request, end of day, delivery. That’s all it takes.
-
Approval with one click
The GO only becomes active once a plan or diff is ready. Questions from Second Key are collected right next to it. Without a GO, nothing goes into the system.
-
Always know where you are
System, project status and session are shown at the top – at a glance, no searching.

Second Key in action
The full story
Josef Lenz, founder of 24-LOG, shows on LinkedIn step by step how Second Key works – in real projects, on video. The latest part comes first.
-
Part 6 · Not squeezed into the standard.
Custom solutions from legacy systems: analysed and rebuilt in SAP®.
-
SAP® translation with AI: complete, before go-live.
-
Part 4 · SAP® AI live demo: CMR consignment note in 11 minutes
One sentence is enough: a finished consignment note with print program and test data.
-
What belongs in an AI chat and what doesn’t.
-
Part 2 · How Second Key came about
25 years of SAP® and why there are two keys in the lock today.
-
Part 1 · The AI builds. The consultant decides.
How we develop SAP® applications today.
Questions & answers
Frequently asked questions about AI in SAP® development
Answers to the most frequently asked questions about Second Key by 24‑LOG.
No. Second Key first presents a plan – object by object, what will be created and changed. Only after the GO from the 24-LOG consultant does the change go into the system. If the plan changes, a new GO is required.
By default on 24-LOG's SAP® S/4HANA system. Only the reviewed result goes into your system, via a transport that your team imports. On request, we develop directly on your system.
SAP® ECC and S/4HANA. The target release is stored per customer; Second Key checks every change against it before activation.
Everything your operations work with in SAP® – old and new: in SAP® GUI, reports with ALV, dynpros with flow logic and GUI status, tables with maintenance dialogs, classes, enhancements and BAdIs; ITS mobile for scanners and forklift terminals in the warehouse; forms with Smart Forms and Adobe Forms including print program; interfaces with IDoc, RFC and OData; plus CDS views, RAP and apps with Fiori and UI5, classic or with ABAP Cloud – including unit tests. Plus translations in SE63 – complete, from the user interface to field labels, messages and the descriptions of technical objects. More in the article SAP® translation with AI.
Everything is in the /LOG24/ namespace, cleanly separated from your own objects.
Every change is versioned in Git, with diff and commit. Status, open items and decisions are documented in the repository, and for every requirement we show, with a reference in the code, whether it has been implemented.
Scaffolding, standard layers and user interfaces are ready in days instead of weeks and months. Testing and acceptance stay with you and the consultant – the AI saves nothing there, and we plan for that honestly.
By default, Second Key works on 24-LOG's SAP® system, not on yours. Your business data stays with you; the AI only sees the source code it is working on. The provider of the language model does not train on this content.
Contact
Unlock your full SAP® potential now
Get to know us – in a first conversation, we identify where the greatest potential in your logistics lies.

Josef Lenz
Managing Director
