Your challenge
Sound familiar? Your demand planning has been running in MC94 and MC95 for years: custom info structures, a few exits, macros that only a handful of people still understand. It works. But in SAP® S/4HANA, flexible planning is part of the compatibility scope, and SAP® points to IBP – with a new project, new licences and new training, for planning that actually works. And simply copying the old transaction? Then you copy exactly what you want to get rid of: a large module pool with fixed tables, without SAP® maintenance, and every new requirement starts with reverse engineering.
Our solution: the 24-LOG Demand Cockpit for operational demand and project planning
The Demand Cockpit replaces MC94 and MC95 with a new interface in its own namespace /LOG24/. Your existing info structure remains the data store – nothing is migrated. The cockpit reads and writes it as a table, without LIS or SOP function modules. Old and new planning run in parallel, and your planners switch when they are ready. Planning is done in months, per material and plant; when transferring to planned independent requirements, the cockpit distributes the quantities across weeks.

Working with 24-LOG
Take the next step: planning that keeps running in S/4HANA – without a new planning system.
The Demand Cockpit was built with Second Key – the agent created the tables, classes, screens, ALV, maintenance dialogs, view clusters, authorization objects and translations itself. An additional key figure, a row of your own data, another field in the planning header: Second Key develops extensions like these directly in your SAP® system. The agent presents the plan, the 24-LOG consultant approves with their GO – checked against your system's release. What Second Key can't do yet, it learns.
Your benefits at a glance
- The familiar material view Forecast, special requirements, safety, total demand, order and delivery quantities in one grid – with macros, row totals and a jump to MD04.
- Project view for project business All materials of a project in one list: change, shift and copy together. The total flows back into the material view.
- Transfer at the push of a button To planned independent requirements, individually or as a background mass run, optionally into a check version first.
- In parallel with MC94 The same planning data, a lock check against flexible planning, no migration.
- Set up instead of retyped The customizing of the old planning is read out and proposed as the cockpit's setup.
- Clean core, S/4HANA-ready In its own namespace, without modification, for SAP® ECC 6.0 and S/4HANA, with more than 300 unit tests and ATC.
Who is this solution ideal for?
The 24-LOG Demand Cockpit is the right solution for companies that:
- maintain their demand or project planning in MC94 and MC95 today.
- are moving or have moved to S/4HANA and need to replace flexible planning.
- plan operationally per material and plant and don't want to introduce a new planning system.
- combine series and project business in one planning.
- want to keep their planning in SAP®, close to requirements planning and MRP.
What does the 24-LOG Demand Cockpit do?
It replaces maintaining and displaying planning values in MC94 and MC95: a material view with planning header, key figure rows and macros, a project view for project business, and the transfer of the forecast to planned independent requirements.
Does the cockpit replace SAP® IBP?
No. The cockpit is built for the operational demand and project planning that runs in MC94 today – in months, per material and plant, directly in SAP®. If you need statistical forecasting or a company-wide S&OP platform, IBP is the right choice.
Do we have to migrate our planning data?
No. Your existing info structure remains the data store. The cockpit reads and writes it as a table; which fields hold which key figure is defined in customizing.
Which releases does the cockpit run on?
On SAP® ECC 6.0 from EHP8 (NetWeaver 7.50) and on S/4HANA. One version for both, in its own namespace /LOG24/, checked against the lowest release.
Can MC94 and the cockpit run at the same time?
Yes. With the "parallel operation" switch, the cockpit checks whether a material is being edited in flexible planning and does not save if the data has changed since it was read. Per planning type, one route maintains the data – you switch when your planners are ready.
How do we adapt the cockpit to our planning?
Rows, calculation rules, macros, horizon and header fields are defined in customizing per planning type. Your own values and checks plug in via BAdIs – and anything beyond that, Second Key develops.
FAQ
Keep planning in SAP® – with a solution built for S/4HANA.
Related case studies
Here you will find our related SAP® case studies.
MC94 is on its way out? Your planning isn't. With the Demand Cockpit, it stays in SAP®.
Schedule a live demo now!